Medical Order Center Bochum

Construction of a sterile goods supply facility

2012/2013 – From Mobile Phones to Scalpels:

Within the “MC 2” hall at the former NOKIA factory, a facility for sterile goods reprocessing is being established with a production capacity of up to 90,000 units per year. After just six months of construction, the formerly empty hall will be able to process surgical instruments from multiple clinics in a sterile and laboratory-like atmosphere. A project by MMM GmbH.

Location: Bochum

Client: MedicalOrder Instruments GmbH

UHB assignment: Further planning, project design, procurement, construction management, and documentation of the entire project for MMM GmbH

Other Projects
    University Hospital Düsseldorf
    Conversion of Building 12.43 into a Blood Bank with Laboratory Wing Location: Düsseldorf Client: University Hospital Düsseldorf C
    Karl-Hansen Clinic – Bad Lippspringe
    Conversion of former central beds to ZSVA (Central Sterile Supply Department) Location: Bad Lippspringe Client: Karl-Hansen-Klinik Gmb
    Mobile AEMP
    Emergencies can happen at any time – every second counts. This also applies to the reprocessing of medical products. To e