Medical Order Center Bochum

Construction of a sterile goods supply facility

2012/2013 – From Mobile Phones to Scalpels:

Within the “MC 2” hall at the former NOKIA factory, a facility for sterile goods reprocessing is being established with a production capacity of up to 90,000 units per year. After just six months of construction, the formerly empty hall will be able to process surgical instruments from multiple clinics in a sterile and laboratory-like atmosphere. A project by MMM GmbH.

Location: Bochum

Client: MedicalOrder Instruments GmbH

UHB assignment: Further planning, project design, procurement, construction management, and documentation of the entire project for MMM GmbH

Other Projects
    House of the Medical Profession – Düsseldorf
    Construction of a service and competence center for medical associations Location: Düsseldorf Client: House of the Medical Profession
    Innovative TinyStudio-Lab
    For the Frankfurt University of Applied Sciences (Faculty of Architecture, Civil Engineering, and Geomatics), we have developed a groundbrea
    Jülich Research Centre
    Since October 2018 The Jülich Research Centre, home to research in physics, energy, and the environment, is receiving two new administra