German Telekom Bonn

Construction of a new parking garage with approximately 630 parking spaces

2011/2012 – Highspeed in Construction:

At the main administration of Deutsche Telekom AG, the new employee parking garage with approximately 17,000 m² of space is now available for use after only six months of construction. The project’s success in every phase was ensured through a short construction time, effective cost control, and strict monitoring of high-quality standards. This project was managed by Goldbeck-West GmbH.

Location: Bonn

Client: Deutsche Telekom AG

UHB assignment: Construction management and documentation of the entire project for Goldbeck West

Other Projects
    Philharmony in the Saalbau Essen
    Renovation and conversion of the Municipal Saalbau into the Philharmonic Hall Location: Essen Client: City of Essen Contractor: Way
    „Three-Slice House” Düsseldorf
    2013/2014 – Strong Attention to Detail: During the comprehensive renovation of the Dreischeibenhaus in Düsseldorf, we had the opportun
    Innovative TinyStudio-Lab
    For the Frankfurt University of Applied Sciences (Faculty of Architecture, Civil Engineering, and Geomatics), we have developed a groundbrea