Interim building extension for the emergency department at Leipzig University Hospital

For the University Hospital Leipzig, we have implemented a turnkey, fully functional interim building extension for medical use as an emergency department. The project was complemented by a covered ambulance access area, ensuring seamless patient care.

The modular expansion was carried out as part of the first construction phase within the ONS project and stands out with its state-of-the-art construction, installations, and equipment. Successfully commissioned before the start of the second construction phase, the interim facility serves as a fully integrated solution for the University Hospital Leipzig during the transition period.

Another testament to our expertise in delivering functional and high-quality construction projects in the medical sector.

Other Projects
    Municipal Hospital – Braunschweig
    Renovation and expansion of the sterile goods department Location: Braunschweig, at Salzdahlumer Straße Client: Klinikum Braunschweig
    Medical Order Center Bochum
    Construction of a sterile goods supply facility 2012/2013 – From Mobile Phones to Scalpels: Within the "MC 2" hall at the former NOK
    „Three-Slice House” Düsseldorf
    2013/2014 – Strong Attention to Detail: During the comprehensive renovation of the Dreischeibenhaus in Düsseldorf, we had the opportun