Medical Order Center Bochum

Construction of a sterile goods supply facility

2012/2013 – From Mobile Phones to Scalpels:

Within the “MC 2” hall at the former NOKIA factory, a facility for sterile goods reprocessing is being established with a production capacity of up to 90,000 units per year. After just six months of construction, the formerly empty hall will be able to process surgical instruments from multiple clinics in a sterile and laboratory-like atmosphere. A project by MMM GmbH.

Location: Bochum

Client: MedicalOrder Instruments GmbH

UHB assignment: Further planning, project design, procurement, construction management, and documentation of the entire project for MMM GmbH

Other Projects
    Innovative TinyStudio-Lab
    For the Frankfurt University of Applied Sciences (Faculty of Architecture, Civil Engineering, and Geomatics), we have developed a groundbrea
    Sky Office Düsseldorf
    ChatGPT Construction of a 89 meter high-rise building Location: Düsseldorf Client: ORCO Group Germany Contractor: Hochtief AG
    Medishop -Gelsenkirchen
    Exhibition and presentation building for nursing and medical aids in the sanitary sector Location: Gelsenkirchen Client: Medishop GmbH