Jülich Research Centre

Since October 2018

The Jülich Research Centre, home to research in physics, energy, and the environment, is receiving two new administrative buildings constructed in modular design on its campus with the assistance of the UHB project.

Location: Jülich

UHB assignment: Project management for two administrative buildings constructed in modular design on the campus of the Jülich Research Centre.

Other Projects
    Refugee accommodations in Dortmund/Essen
    2015-2016 From 2015, UHB was involved for two years in the construction of several refugee shelters at the time of the large wave of refu
    Karl-Hansen Clinic – Bad Lippspringe
    Conversion of former central beds to ZSVA (Central Sterile Supply Department) Location: Bad Lippspringe Client: Karl-Hansen-Klinik Gmb
    German Telekom Bonn
    Construction of a new parking garage with approximately 630 parking spaces 2011/2012 – Highspeed in Construction: At the main admini